Testing & Commissioning

Systematic inspection, testing and commissioning of MEP systems prior to handover.

Supervisors coordinating a work inspection request on installed MEP services

Inspection & WIR Coordination

Work inspection requests and site inspections are coordinated so installed MEP works can be reviewed before concealment, testing or handover. Records are kept against the approved drawings and project inspection process.

Commissioning of electrical panels and mechanical plant

Testing & Commissioning

Installed MEP systems are tested and commissioned in a planned sequence. The objective is to demonstrate that systems operate as installed, documented and ready for client use.

Pressure gauge and isolated pipework during hydrostatic testing

Hydrostatic Testing

Applicable piping systems are hydrostatically tested in accordance with the project specification, with test sections, pressures and durations agreed before the test starts.

Valved chilled water pipework prepared for pressure testing

Pressure Testing

Pressure testing is used to verify the integrity of applicable MEP pipework before insulation, backfilling or concealment. Leaks are identified and rectified before the system proceeds.

Pipe flushing hoses, valves and drain-down during system flushing

Flushing

Systems are flushed to remove debris and prepare pipework for operation, following the specified flushing method and cleanliness requirements.

Chilled water plant ready for system testing

Chilled Water System Testing

Chilled water systems are tested for tightness, flow and operating conditions as required by the project, before they are placed into regular service.

Pump sets and headers being checked during pump testing

Pump Testing

Pumps are checked for rotation, operation, pressure and control interface so they can be accepted as part of the commissioned system.

HVAC ductwork prepared for testing and balancing

HVAC Testing & Balancing

Air and water systems are tested and balanced to the approved design values where specified, with adjustments recorded as part of commissioning documentation.